Location,TX 75035,USA
EN
FR
EN
DE
IT
ES
PT
NL
Professionals
Products
SPRING
®
– Hybrid
FLASH
®
– Photovoltaic
Performances
Commitments
Warranties
Applications
Solar Domestic Hot Water
Solar heat pump
Solar swimming pool
Installations
Company
Mission
Evolution
Support
Press Reviews
FAQ
Blog
Solar calculator
Products
SPRING
®
– Hybrid
FLASH
®
– Photovoltaic
Performances
Commitments
Warranties
Applications
Solar Domestic Hot Water
Solar heat pump
Solar swimming pool
Installations
Company
Mission
Evolution
Support
Press Reviews
FAQ
Blog
Solar calculator
Puissance:
≤ 3 kWp
Hybrid solar installation on a house – Paris region (FR)
Installation date:
Before 2015
Application:
Domestic hot water
Panels: 12 hybrid
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
6 hybrid solar panels coupled to a gas boiler – Sables-d’Olonne (FR)
Installation date:
2018
Application:
Domestic hot water
Panels: 6 Spring panels
PV Power Output:
≤ 3 kWp
Mounting system:
On-roof
8 DualSun hybrid solar panels to replace thermal panels – Gimel (CH)
Installation date:
2015
Application:
DHW + low-temperature heating
Panels: 8 hybrids
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
Passive house with hybrid solar installation – Vaucluse (FR)
Installation date:
Before 2015
Application:
Domestic hot water
Panels: 12 hybrid
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
Solar heating with hybrid panels – Bouches du Rhône (FR)
Installation date:
2016
Application:
Domestic hot water
Panels: 4 hybrid
PV Power Output:
≤ 3 kWp
Mounting system:
On-roof
Installation of hybrid solar panels on a mountain chalet in France (FR)
Installation date:
Before 2015
Application:
Domestic hot water
Panels: 12 hybrids
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
Hybrid solar installation to reduce home’s carbon footprint – Provence (FR)
Installation date:
2015
Application:
Domestic hot water
Panels: 6 hybrids
PV Power Output:
≤ 3 kWp
Mounting system:
On-roof
10 DualSun panels for hot water and electricity for 4 people – France
Installation date:
2018
Application:
Domestic hot water
Panels: 4 hybrids + 6 photovoltaics
PV Power Output:
≤ 3 kWp
Mounting system:
On-roof
12 hybrid panels for hot water and pool heating – South of France (FR)
Installation date:
2017
Application:
DHW + pool heating
Panels: 12 hybrids
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
Hybrid solar installation for a family on a house – Lyon area (FR)
Installation date:
Before 2015
Application:
Domestic hot water
Panels: 6 hybrids + 6 photovoltaics
PV Power Output:
≤ 3 kWp
Mounting system:
In-roof (BIPV)
Posts navigation
Page
1
Page
2
Page
3
Page
4
Search for:
Meta Data and Taxonomies Filter
Type of installation:
Residential
Commercial
Application:
Domestic hot water
Eau chaude sanitaire (ECS)
Photovoltaic
Zero-energy swimming pool
DHW + pool heating
DHW + low-temperature heating
Couplages:
Electric
Gas Heater
Geothermal
Heat pump (air-water)
Heat pump (water-water)
Home
Résistance électrique
Wood pellet boiler
PV Power Output:
≤ 3 kWp
≤ 9 kWp
≤ 36 kWp
> 36 kWp
Pin It on Pinterest